| Location: | Sturgeon Falls, ON |
| River System: | Sturgeon River |
| Nameplate Capacity: | 7.0 MW |
| OPA Contracted Capacity: | 6.5 MW |
| Operator: | West Nipissing Power Generation |
| Technology: | Hydroelectric |
| Turbines: | Six double runners Francis turbines, plus two unused bays |
| Originally Built: | 1902 |
| Coordinate: | TBD ---- 46.229 - 79.567 (?) |
Project Contacts:
|
Ontario Power Authority Media and Public Relations T. 416-969-6307 or 1-800-797-9604 |



