E-1-1
|
Structure of Transmission Evidence
|
|
E-2-1
|
Overview of Transmission Planning
|
|
E-2-2
|
Facilitating the Development and Use of Renewable Energy and Enabling 2010 and 2025 Renewable Targets
current version 080505 replaces original
|
Attachment 1 |
All Inclusive LUEC Analysis of Renewable Resources
|
|
Attachment 2
|
Study of Enabler Transmission in other Jurisdictions
|
|
|
E-2-3
|
Integrating Conservation
|
|
E-2-4
|
Enabling Nuclear
|
|
E-2-5
|
Enabling Natural Gas
|
|
E-2-6
|
Enabling Coal Replacement
|
|
E-2-7
|
Ensuring Reliability
|
|
Projects to Facilitate and Enable Renewables
|
|
E-3-1
|
North-South Transmission Reinforcement
current version 071019 - replaces original
|
Attachment 1 |
IESO System Impact Assessment for North-South Tie Upgrade
|
|
Attachment 2
|
IESO System Impact Assessment for North-South Tie Upgrade – Addendum
|
|
Attachment 3
|
Hardy Stevenson Report for North-South Transmission Reinforcement
|
|
|
E-3-2
|
Sudbury West Transmission Reinforcement
|
Attachment 1 |
IESO Planning Study for Sudbury West Transmission Capability
|
|
|
E-3-3
|
Sudbury North Transmission Reinforcement
current version 071019 - replaces original
|
Attachment 1 |
IESO Planning Study for Sudbury North Transmission Capability
|
|
Attachment 2
|
Hardy Stevenson Report for Sudbury North Transmission Reinforcement
|
|
|
E-3-4
|
East Lake Superior Transmission Reinforcement
|
Attachment 1 |
Great Lakes Power Planning Study for East Lake Superior Transmission Capability
|
|
Attachment 2
|
Hardy Stevenson Report for East Lake Superior Transmission Reinforcement
|
|
|
E-3-5
|
Manitoba Purchase Incorporation
|
|
E-3-6
|
Quebec/Labrador Purchase Incorporation
|
Attachment 1 |
Hardy Stevenson Report for Quebec/Labrador Purchase
|
|
|
E-3-7
|
Incorporating Little Jackfish and East Lake Nipigon Renewable Resource Development
|
Attachment 1 |
Hardy Stevenson Report for Little Jackfish and East Lake Nipigon Renewable Resource Development
|
|
|
E-3-8
|
Enabling Goderich Area Renewable Resource Development
|
|
E-3-9
|
Enabling Bruce Peninsula Renewable Resource Development
|
Attachment 1 |
Hardy Stevenson Report for Bruce Peninsula Renewable Resource Development
|
|
|
E-3-10
|
Enabling Manitoulin Island Renewable Resource Development
current version 071019 - replaces original
|
Attachment 1 |
Hardy Stevenson Report for Manitoulin Island Renewable Resource Development
|
|
|
Projects to Enable Nuclear
|
|
E-4-1
|
Oshawa Area Transformer Station
current version 071019 - replaces original
|
Attachment 1 |
IESO Preliminary Assessment Report: Nuclear
Scenarios in the GTA East
|
|
|
Projects to Ensure Reliability
|
|
E-5-1
|
Northern York Region
|
Attachment 1 |
IESO Report: System Impact Assessment Report for Holland TS
|
|
|
E-5-2
|
Kitchener-Waterloo-Cambridge-Guelph
current version 080505 replaces version 071019 and original
|
Attachment 1 |
IESO Report: System Impact Assessment for Cambridge Preston 115 /230 kV Auto
|
|
|
E-5-3
|
Southwest GTA
current version 080505 replaces version 071019 and original
|
Attachment 1 |
IESO Preliminary Assessment Report: Richview – Manby Adequacy
|
|
Attachment 2
|
IESO Preliminary Assessment Report: Generation Incorporation in Southwest GTA
|
|
|
E-5-4
|
Windsor/Essex
current version 071019 - replaces original
|
Attachment 1 |
IESO Report: System Impact Assessment Report for Belle River TS
|
|
|
E-5-5
|
Central & Downtown Toronto
current version 071019 - replaces original
|
Attachment 1 |
IESO Preliminary Assessment Report: Manby/Leaside Normal and Emergency Transfer Study
|
|
Attachment 2
|
IESO Preliminary Assessment Report: Manby – Leaside Adequacy
|
|
Attachment 3
|
IESO Preliminary Assessment Report: New Transmission Options to Central Downtown Toronto
|
|
Attachment 4
|
IESO Preliminary Assessment Report: Distribution Connected Generation in the Leaside 115 kV System
|
|
Attachment 5
|
Hydro One: Summary of Asset Condition and Sustainment Plans for the Leaside and Manby 115 kV System
|
|
Attachment 6
|
Hydro One: Toronto Third Supply Cost Estimates
|
|
Attachment 7
|
Brookfield Power: Toronto Third Supply, HVDC Options for Supplying Downtown Toronto
|
|
Attachment 8
|
Hardy-Stevenson: Project 7- Central and Downtown Toronto
|
|
|
E-5-6
|
Milton Transformer Station
current version 071019 - replaces original
|
|
Projects to Enable Coal Replacement
|
|
E-6-1
|
Thunder Bay Area
|
|
E-7-1
|
Third Party Supporting Evidence referenced within various Transmission evidence exhibits
|
Attachment 1 |
NERC Transmission Planning Standards
|
|
Attachment 2
|
NPCC Document A-2 – Basic Criteria for Design and Operation of Interconnected Systems
|
|
Attachment 3
|
IESO Ontario Resource and Transmission Assessment Criteria (IMO_REQ_0041)
|
|
|
|
|